Mitchell Land Surveyors have completed many successful projects for property owners, developers, civil and construction companies, government authorities, architects, engineers and other property and development professionals. We are dedicated to finding the right solution for each project. We are proud to have been involved in many successful projects over the years.
Surveying services for 42 metre footbridge including control survey, set out bridge, lifts and stairs. Offsite checks on bridge structure prior to lifting into place on site to tight tolerances.
30,000 cubic meter storage facility. All surveying from concept to completion including detail survey & set out of civil works and building. Building set out including steel structure, bolts, 2 gantry cranes and set out automated racking system.
Boundary and easement surveys including set out the boundaries of private properties surrounding the project. Approximately 8km of boundaries surveyed and set out.
Construction set out of 68 retirement villas at Anglicare Caddens Village.
Detail Survey & Strata subdivision of 12 residential units at Cronulla together with consolidation plan and easements and construction set out works.
Detail survey of terrace house in Annandale together with Plan of Redefinition of 2 adjoining lots to rectify errors in existing plan and create new easements for encroachment.
Three lot subdivision of 3 x 3 bedroom villas in Kogarah together with construction set out of buildings, final ident, works as executed on drainage and volume survey of OSD.
Delimitation survey of cottage in Balmain to remove the limitation on title.
Staged Strata subdivision for 111 residential units at Dee Why together with Plan of Consolidation and Creation of Easements.
Boundary adjustment survey re-align the boundaries between 2 properties and release of unnecessary easements.
Construction set out for upgrade to station including new platform surface and coping set out to tight tolerances, new concourse and King Street building refurbishments
Construction set out for Pedestrian Footbridge crossing the Princes Highway at Heathcote. Set out footings, lifts, stairs and steel frame bridge bolts and factory set out.
Detail survey of 1930 CHUBB heritage building for the design of new apartments above. Survey included floor plans and roof beam details together with elevations of the distinctive building facade.
Detail survey of entire hospital site and surrounding properties for the proposed $30m upgrade to the hospital. Survey included floor plans of large parts of the hospital.
POSI survey of over 150 survey marks on 60 deposited plans in vicinity of road works. Develop strategy to replace marks. Prepare Deposited Plan to preserve location of marks on the public record.
Detail survey of a large residential waterfront property on Sydney Harbour for proposed development together with a Plan of Survey including definition and approval of the Mean High Water Mark boundary.
Boundary survey and construction set out of waste facility building including set out of civil works, final ident and works as executed together with OSD positive covenant and restriction.
Create easements for new electrical works including indoor substation, underground cables and padmount substations together with access easements and road dedication plan.
Construction set out for the upgrade to 11 railway stations from Sefton to Macarthur. Set out new lifts, stairs, footbridges, carparks and civil works.
Surveying set out, as builts and monitoring of two sections of pipeline undergoing repairs.